SAP C_TS422_2023 Exam - Free questions
Certification Provider:
SAP
Exam Name:
SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
Exam Code:
C_TS422_2023
C_TS422_2023 Free Questions:
Below you can find SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing exam free sample questions which will help you to prepare for your upcoming SAP certification exam. These questions will give you an idea of what to expect on the exam and help you review the C_TS422_2023 study material provided in SAP Learning hub. However we recommend that you enrol in premium SAP C_TS422_2023 questions which will guarantee you to pass your exam.
These C_TS422_2023 questions are updated frequently, so you can be confident that you're studying with the most up-to-date information available. ExamStudyZone also provides answer keys so that students can check whether their answers are correct or not.
Additionally, going through SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing practice questions can help you identify any areas where you need more review. Taking advantage of our C_TS422_2023 demo questions is a great way to set yourself up for success on the real exam.
Question No. 1) What is necessary for procurement in the demand management process?
A) Exceeding stock or receipt situation
B) Having a net requirements calculation
C) Having a planning strategy
D) Having planned independent requirements
Question No. 2) Which factors are included in the requirements situation? (2 correct)
A) Stock
B) MRP relevance
C) Requirement offset each other
D) Sales orders
E) Forecast
Question No. 3) How is the demand program determined in pure make-to-stock production according to strategy 10?
A) With reference to sales orders
B) Without reference to sales orders
C) Based on the stock available
D) Based on ATP logic
Question No. 4) Are sales orders relevant for MRP in strategy 10?
A) Yes
B) No
C) Only for information purposes
D) Both a and c
Question No. 5) Which elements are included in MRP requirements? (4 correct)
A) Sales orders
B) Stock levels
C) Material reservations
D) Dependent requirements
E) Purchase requisitions
Question No. 6) What does the system create when shortage quantities are determined in MRP?
A) Production orders
B) Purchase requisitions
C) Sales orders
D) Stock
Question No. 7) What is guaranteed by material requirements planning (MRP)?
A) Cost reduction
B) Material availability
C) Time management
D) Production increase
Question No. 8) Where does MRP need to be executed?
A) In high level codes
B) In all low level codes
C) In selected codes
D) In external codes
Question No. 9) What tools does SAP ERP offer for sales and operations planning tasks? (2 correct)
A) Flexible planning
B) Standard SOP
C) SAP IBP
D) Demand Management
E) Google Analytics
Question No. 10) How are SAP S/4HANA PP master data objects integrated into PP/DS?
A) Directly copied
B) Mapped
C) Transferred via CIF
D) Created in PP/DS
Question No. 11) In which scenario is PP/DS master data created directly in PP/DS?
A) When equivalent exists in SAP S/4HANA
B) When no equivalent is present in SAP S/4HANA
C) During data mapping
D) During CIF integration
Question No. 12) What is the primary function of the Alert Monitor?
A) Informing of exceptions
B) Sending emails
C) Access to planning version
D) Display alerts
Question No. 13) Which types of alerts are issued? (3 correct)
A) Information
B) Warning
C) Error
D) Alert
E) Access
F) Substitute
Question No. 14) When is the final assembly triggered in planning strategy 50?
A) After the planned order is created
B) Before the sales order is received
C) Upon receipt of the sales order
D) During the production stage
Question No. 15) What is the main advantage of planning without final assembly?
A) Reduced production cost
B) Reduced delivery times
C) Increased production speed
D) Increased order quantity
Question No. 16) What is a heuristic defined through in S/4HANA PP/DS?
A) An algorithm
B) A manual process
C) A software bug
D) A user feedback
Question No. 17) Which elements can be influenced in a heuristic algorithm in S/4HANA PP/DS? (2 correct)
A) The process
B) Specific parameters
C) User feedback
D) Software bugs
Question No. 18) What must be ensured before releasing a production order?
A) All resources are available
B) Order is complete
C) Order is approved
D) Materials are organized
Question No. 19) Who needs to be able to set up material availability checks in Customizing?
A) MRP controller
B) Production scheduler
C) Member of the project team
D) Production manager
Question No. 20) What is the primary function of the Capacity Scheduling Board?
A) Analyze and manage operations schedules
B) Track inventory levels
C) Monitor employee productivity
D) Manage customer orders
Question No. 21) How is the Capacity Scheduling Board accessed?
A) Via SAP Fiori launchpad
B) Directly from the desktop
C) Through email notifications
D) Using a mobile app
Question No. 22) What is the role of process orders in in-house production of products?
A) Control the entire production process
B) Only for scheduling
C) For quality inspection only
D) For goods receipt only
Question No. 23) What triggers the replenishment or production of material in the kanban system?
A) Consumption of a certain quantity of material
B) Time intervals
C) Specific order requests
D) Automatic replenishment schedules
Many students have gone through these questions along with premium tests and cleared their exam.
C_TS422_2023 Exam Answers