Below you can find SAP S/4HANA Cloud, public edition - Manufacturing exam free sample questions which will help you to prepare for your upcoming SAP certification exam. These questions will give you an idea of what to expect on the exam and help you review the C_S4CMA_2308 study material provided in SAP Learning hub. However we recommend that you enrol in premium SAP C_S4CMA_2308 questions which will guarantee you to pass your exam.
These C_S4CMA_2308 questions are updated frequently, so you can be confident that you're studying with the most up-to-date information available. ExamStudyZone also provides answer keys so that students can check whether their answers are correct or not.
Additionally, going through SAP S/4HANA Cloud, public edition - Manufacturing practice questions can help you identify any areas where you need more review. Taking advantage of our C_S4CMA_2308 demo questions is a great way to set yourself up for success on the real exam.
Question No. 1) How are capacities considered in planning in the Perform Production Capacity Planning and Evaluation (31L) scope item?
Options:
A) Material Requirements Planning (MRP) does NOT deliver capacity requirements. These are created in a separate step in capacity planning. Leveling is done only after conversion.
B) Material Requirements Planning (MRP) delivers capacity requirements. Overloads are identified and worked on subsequently. Conversion to production orders is part of the process.
C) Material Requirements Planning (MRP) delivers capacity requirements. Overloads are identified by capacity evaluation. In case of bottleneck overloads the MRP is started again.
D) Material Requirements Planning (MRP) delivers capacity requirements that are leveled simultaneously with available capacity. Remaining overloads are indicated by overload alerts.
Question No. 2) In the SAP Best Practices scenario Quality Management of Internal Problems (2QP), which functions can you use to process a quality notification? (3 correct)
Options:
A) Monitor defects
B) Response monitoring for tasks
C) Status management
D) Follow-up actions for tasks
E) Inspect nonconformity
Question No. 3) Which business role can perform tasks in the SAP Best Practices Scenario Rework Processing - Work in Process (BJQ)?
Options:
A) Warehouse Clerk
B) Production Planner - Discrete Manufacturing
C) Production Supervisor - Discrete Manufacturing
D) Cost Controller
Question No. 4) In the SAP Best Practices scenario Quality Management in Discrete Manufacturing (1E1), which valuation methods does the Record Inspection Results app offer? (2 correct)
Options:
A) Variable inspection by S-Method (valuation mode 300)
B) Mean value check within a tolerance range (valuation mode 700)
C) Attributive inspection number of defects (valuation mode 200)
D) Attributive inspection of nonconforming units (valuation mode 100)
Question No. 5) Which capabilities do the SAP Fiori apps Manage Material Coverage and Monitor Material Coverage support in the SAP Best Practices scenario Make-to-Stock Production - Discrete Manufacturing (BJ5) (2 correct)
Options:
A) Open the delivery schedule for materials with scheduling agreements
B) Choose a different shortage definition
C) Approve purchase orders
D) Create purchase requisitions
Question No. 6) What are the corrective steps that must be performed by a production operator to register rework and defects within a production order? (3 correct)
Options:
A) Assign by-products in the bill of material within the production order
B) Assign production resources and tools to the rework operation in the production order
C) Insert a rework operation within the production order
D) Execute production order confirmation at rework operation
E) Confirm scrap for defective material and material that can be reused
Question No. 7) When a purchase order is created in the headquarters system in the Subsidiary as Production Unit and Internal Supplier to Headquarters (2IT) scope item, what is automatically uploaded to the subsidiary system?
Options:
A) A production order
B) A sales order
C) A purchase requisition
D) A planned order
Question No. 8) What are the first steps in the Material Requirements Planning processes in SAP S/4HANA Cloud? (2 correct)
Options:
A) Back order processing
B) Manage planned independent requirements
C) Convert planned orders
D) Demand forecasting
Question No. 9) Based on the SAP Activate methodology, which of the following tests are formal, and therefore must be documented during implementation? (2 correct)
Options:
A) Business process test
B) Integration test
C) String test
D) Unit test
Question No. 10) In the Organizational Structure app in SAP Central Business Configuration, which of the following entities can be added under the Company root node? (2 correct)
Options:
A) Sales Organization
B) Division
C) Purchasing Organization
D) Plant